Life member Alan McLean and Facilities Director Michael Turner with the help of Rochelle Olarenshaw are leading a comprehensive refurbishment program, thanks to funding from Life Saving Victoria and Victoria State Government’s Pick My Project – won by Brendan Smart and Adrian Koller.

 

20 June 2019

Glaziers are replacing various windows throughout the clubhouse

  • Window near Training Room at the end of the upstairs hallway (this could not be cleaned or salvaged – pitted by salt-air)

  • Ocean-facing window in the Bar Area - last one on the far-right, closest to bi-fold doors (as above – pitted by salt-air).  This was the only one of these bank of windows that needed replacing - the rest just need to be cleaned; and in the case of the double-hung windows, serviced - which Taranto's are doing as part of their quote.

  • Window in the upstairs Men's Bathroom - this was not up to current building code for an upstairs area, so has been replaced with something that is (frosted for privacy).


30 May 2019

Listed below is a summary of works which will be undertaken over the next few months for the refurbishment of the Clubhouse. Money for the work was obtained from the LSV building audit and the State Government’s ‘Pick My Project’ funds. An insurance claim to re- instate the clubhouse after flood damage to the ground floor and training room will also be completed. All works should be completed well before the opening of the 2019-20 patrol season (ie. 30th November 2019).

Life Saving Victoria Building audit work to be completed

  • Replace deteriorated pathways. Will be done with new concreting around front club

  • Replacement of the retaining wall at the rear and side of the clubhouse is on hold due to PINP (Phillip Island Nature Park) master plan having the retaining wall in a different location

  • Stairs up to kiosk area to have new handrails and tactiles fitted to improve safety

  • New deck railings have been ordered. Need to organise working group to install

  • Corroded steel fittings have been replaced

  • Repairs to male bathroom have been completed

  • Decking replacement has been completed

Victoria State Government Pick My Project

Pick My Project agreement was signed 25thFebruary and works include the following;

  • Replace all windows

  • Replace all roofing screws, clean gutters and other roof work

  • Replace and upgrade of blinds in function room

  • Temporary removal of all pictures, boards, artefacts from walls to allow for painting

  • Repair and painting of all walls and ceilings

  • Replace carpet in function area and training room

  • Replace chairs and tables in function area and training room

  • Replacement of kitchen equipment including cook top/oven, fridge/s, microwave, hand dryers

  • Replace all mattresses

Insurance work to be completed;

  • Demolition & rubbish removal (incl collapsed water tank)

  • Re-pair/replacement and painting of various areas including walls, skirting boards, ceilings, doors, cupboards in the Training room and downstairs areas

  • Repair/replacement of water damaged carpet

Other works that are required or being investigated are:

  • Water tank replacement. The Club is working with Westernport Water and PINP to either replace the tanks or upgrade the water main. Quotes have been obtained for replacement tanks, however negotiations are on-going to upgrade the water main. Replacement is not covered by insurance and funding will need to be sourced.

  • Although not in any of the funding initiatives the kitchen exhaust ducts will be cleaned as part of the refurbishment for safety reasons

  • Installation of a grease trap to reduce the amount of fat entering the sewerage system which is causing problems with the pump. Estimated cost is $20,000

More information

If you would like further information on any of the works please contact:

President : Rob Murphy - president@woolamaibeach.asn.au